23948sdkhjf

Fakta om udbudet

EU-nr
2022/S 091-250490
Offentliggjort
11.05.2022
Udbudstype
Udbud med forhandling uden forudgående offentliggørelse

Udbyder

Danmarks Tekniske Universitet - DTU

Vindere

Glovebox-integrated sputter chamber for phosphosulfides

(11.05.2022)
Kurt J. Lesker
Austin House

Glovebox-integrated sputter chamber for phosphosulfides


Danmarks Tekniske Universitet - DTU

Bekendtgørelse med henblik på frivillig forudgående gennemsigtighed

Varer

Retsgrundlag:
Direktiv 2014/24/EU

Del I: Ordregivende myndighed/enhed

I.1) Navn og adresser
Officielt navn: Danmarks Tekniske Universitet - DTU
CVR-nummer: 30060946
Postadresse: Anker Engelunds Vej 1
By: Kgs. Lyngby
NUTS-kode: DK01 Hovedstaden
Postnummer: 2800
Land: Danmark
Kontaktperson: David Fajnzylber
E-mail: dafaj@dtu.dk
Internetadresse(r):
Overordnet internetadresse: http://www.dtu.dk
I.4) Type ordregivende myndighed
Offentligretligt organ
I.5) Hovedaktivitet
Uddannelse

Del II: Genstand

II.1) Udbuddets omfang
II.1.1) Betegnelse:

Glovebox-integrated sputter chamber for phosphosulfides

II.1.2) Hoved-CPV-kode
38000000 Laboratorieudstyr, optisk udstyr og præcisionsudstyr (ikke briller)
II.1.3) Kontrakttype
Varer
II.1.4) Kort beskrivelse:

A glovebox-integrated vacuum chamber for reactive sputter deposition and evaporation of thin film materials containing phosphorus, sulfur, nitrogen, and one or more metals. The system should al-low for: (i) loading/unloading of the substrates with deposited films, as well as of the sputter tar-gets, in an inert atmosphere, (ii) safe usage of the toxic/corrosive H2S, PH3, and NH3 gases within the chamber, (iii) integration with a sulfur cracking source, (iv) deposition temperatures between -100 °C and +500°C, and (v) simple mounting of sputter targets without screws.

II.1.6) Oplysninger om delkontrakter
Kontrakten er opdelt i delkontrakter: nej
II.1.7) Udbuddets samlede værdi (eksklusive moms)
Værdi eksklusive moms: 3 300 000.00 DKK
II.2) Beskrivelse
II.2.2) Supplerende CPV-kode(r)
38000000 Laboratorieudstyr, optisk udstyr og præcisionsudstyr (ikke briller)
II.2.3) Udførelsessted
NUTS-kode: DK01 Hovedstaden
II.2.4) Beskrivelse af udbuddet:

The first element of the acquisition is a glovebox, i.e., a fully encapsulated work bench in a nitro-gen atmosphere that is almost free of oxygen and water (less than 0.1 ppm each). Materials inside the glovebox are handled through gloves placed on the front panel of the glovebox.

The second element of the acquisition is a vacuum chamber for reactive sputter deposition and evaporation of thin film materials simultaneously containing phosphorus, sulfur, nitrogen, and one or more metals. The supplier of the chamber should have previous documented experience in the design and delivery of glovebox-integrated sputter systems.

Loading/unloading of substrates with deposited films, sputter targets, and evaporation materials should be performed in an inert atmosphere using the gloves. Replacement of sputter targets in the chamber should be made possible without having to screw/unscrew any parts, for example by magnetically held magnetron sources. The chamber should have three sputter sources and one thermal evaporation source. The chamber should have access to the following gases: pure Ar, pure N2, 20% O2 in Ar, 10% PH3 in Ar, 10% H2S in Ar, 10% NH3 in Ar. It should be made possible to pump and purge the chamber with ambient air to prevent the accumulation of air-sensitive coatings inside the chamber. This should be done without compromising the purity of the glovebox atmos-phere.

The chamber design should address the toxicity and corrosion properties of H2S, PH3, and NH3. In particular, the components of the system should be checked (and replaced as needed) to ensure compatibility with these gases. Appropriate interlocks and ventilated gas boxes are required. The supplier should also have previous documented experience in the design and delivery of vacuum systems with access to H2S, PH3, and NH3, specifically addressing the safety handling of highly toxic gasses such as PH3.

The chamber design should make it possible to integrate a sulfur cracking source from an external supplier. Specifically, it should be possible to adjust the horizontal and vertical position of the cracking source to obtain different cracker-substrate distances and to have the cracker point at dif-ferent parts of the substrate. The supplier should have previous documented experience in integrat-ing cracking sources from other suppliers into their own chambers.

The temperature of the substrate holder in the chamber should be adjustable between -100 °C and +500°C during deposition. It should be made possible to apply rotation and a radio-frequency bias to the substrate during processing.

II.2.5) Tildelingskriterier
II.2.11) Oplysninger om optioner
Optioner: ja
Beskrivelse af optioner:

The contract contains options on service agreement, spare parts and system customizations.

II.2.13) Oplysninger om EU-midler
Udbuddet vedrører et EU-finansieret projekt og/eller program: nej
II.2.14) Yderligere oplysninger

Del IV: Procedure

IV.1) Beskrivelse
IV.1.1) Proceduretype
Udbud med forhandling uden forudgående offentliggørelse
  • Kun en bestemt økonomisk aktør kan levere de pågældende bygge- og anlægsarbejder, varer eller tjenesteydelser af følgende årsag:
    • manglende konkurrence af tekniske årsager
Forklaring:

The present acquisition consists of a highly customized film deposition tool that cannot be ordered from a catalog and requires a high degree of customization. This already rules out many companies that only offer standard products.

We have contacted several reputable suppliers or custom vacuum deposition setups and found that only Kurt J. Lesker Company could deliver all specifications.

Other companies either do not provide deposition systems that are directly accessible through a glovebox or don’t have previous experience with PH3 and H2S gases or integration of a cracking source. It is also our experience that companies are often only willing to offer general-purpose corrosion-resistant components, instead of gas-specific components.

Andrea Crovetto has recently been awarded an ERC Starting Grant with start date 1 August 2022 and access to additional funding for the purchase of this specific piece of equipment. Since the current delivery time for this system is estimated as 10 months, this system should be ordered as soon as possible. Another reason why time is an issue is that the ERC Starting Grant does not pre-finance the system but will only pay for its depreciation during the time of the project (5 years) and will only start to do so once the system has been delivered.

IV.1.3) Oplysninger om rammeaftale
IV.1.8) Oplysninger om GPA-aftalen om offentlige udbud
Dette udbud er omfattet af GPA-aftalen: ja
IV.2) Administrative oplysninger

Del V: Kontrakt-/koncessionstildeling

Betegnelse:

Glovebox-integrated sputter chamber for phosphosulfides

V.2) Kontrakt-/koncessionstildeling
V.2.1) Dato for beslutningen om kontrakttildeling:
05/05/2022
V.2.2) Oplysninger om tilbud
Kontrakten er blevet tildelt en sammenslutning af økonomiske aktører: nej
V.2.3) Kontrahentens/Koncessionshavers navn og adresse
Officielt navn: Kurt J. Lesker
By: Austin House
NUTS-kode: UK United Kingdom
Land: Det Forenede Kongerige
Kontrahenten/koncessionshaveren bliver en SMV: nej
V.2.4) Oplysninger om kontraktens/delkontraktens/koncessionens værdi (eksklusive moms)
Kontraktens/delaftalens/koncessionens samlede værdi: 3 300 000.00 DKK
V.2.5) Oplysninger om underentreprise

Del VI: Supplerende oplysninger

VI.3) Yderligere oplysninger:
VI.4) Klageprocedurer
VI.4.1) Organ med ansvar for klageprocedurerne
Officielt navn: Klagenævnet for Udbud
Postadresse: Nævnenes hus, Toldboden 2
By: Viborg
Postnummer: 8800
Land: Danmark
E-mail: klfu@erst.dk
Telefon: +45 35291000
Internetadresse: http://www.klfu.dk
VI.4.3) Klageprocedure
Præcise oplysninger om klagefrist(er):

Complaint regarding prequalification:

Complaint regarding prequalification must be submitted no later than 20 calendar days after notification has been sent to the concerned Candidates informing them who has been selected, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 1.

Complaint regarding award of contract:

Complaint regarding the award of a contract must be submitted no later than 45 calendar days from the date after the Contracting Authority has published a notice in the European Union Official Journal informing that the Contracting Authority has awarded/concluded a contract, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 1.

Complaint regarding award of a contract under a framework agreement with a reopening of the competition (mini-tender):

Complaint regarding the award of a contract under a framework agreement with a reopening of the competition must be submitted no later than 30 calendar days from the date after the Contracting Authority has notified the concerned Tenderers that a contract based on a framework agreement with a reopening of the competition has been awarded/concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 2.

Complaint regarding the award of a framework agreement:

Complaint regarding the award of a contract must be submitted no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, Section 2, no. 3.

Complaint regarding direct award of contract:

Complaint that the Contracting Authority, contrary to the Public Procurement Act, has concluded a contract without prior publication of a contract notice in the European Union Official Journal must be submitted no later than 30 calendar days from the date after a contract award notice has been published by the Contracting Authority in the European Union Official Journal and that contract award notice includes the grounds for the decision to award the contract directly, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 3.

Compliant regarding public procurements below the EU threshold:

Complaint regarding violation of public procurements below the EU threshold must be submitted no later than 45 calendar days from the date after the Contracting Authority has notified the Tenderers about the award of contract, if this notification includes the grounds for the decision; and no later than 6 months from the date after the Contracting Authority has notified the concerned Candidates and Tenderers that a framework agreement has been concluded, if the notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders) § 7, section 4, no. 1 and 2. Compliant regarding prequalification on procurement below the EU threshold must be submitted no later than 20 calendar days from the date after the Contracting Authority has sent a notification to the concerned Candidates who has been selected and this notification includes the grounds for the decision, cf. lov om Klagenævnet for Udbud (Complaints Board for Tenders)) § 7, Section 5.

VI.4.4) Tjeneste, hvor der kan fås oplysninger om klageproceduren
Officielt navn: Konkurrence- og Forbrugerstyrelsen
Postadresse: Carl Jacobsens Vej 35
By: Valby
Postnummer: 2500
Land: Danmark
E-mail: kfst@kfst.dk
Telefon: +45 41715000
Internetadresse: http://www.kfst.dk
VI.5) Dato for afsendelse af denne bekendtgørelse:
06/05/2022